The old bridge over the Erewash Canal had reached the end of its life. Replacing it was a chance to do more than get people across the water. The new bridge reconnects the town with West Park and the canal.
It’s now open. A single arch carries a gently curving deck with room for people walking and cycling to share it comfortably, and gradients smooth enough that nobody has to think about them. The lighting is built into the bridge, and clear sightlines keep it feeling open and safe after dark.
The balustrade takes its cue from the lace that made Long Eaton. Slender vertical members run across the canal making reference to the lacemakers loom, with a ribbon-like balustrade inspired by the wedding lace made in the nearby Harrington Mills. The red handrail comes from the same tradition; lacemakers used a red thread to mark where a piece should be repaired. On a bridge that replaces one at the end of its life, it felt right to carry that sign of repair and renewal.
Beside the bridge, a new waterside terrace brings people down to the water’s edge, somewhere to sit, meet friends and allow kayaks and paddle boards to enter the water.
We worked with Erewash Borough Council, the town champions and a great many local people throughout, and collaborated closely with DeSimone on the engineering.
Defining the project’s purpose, business case, and initial advice.
Developing the project brief, assembling the project team, and conducting site surveys
Creating initial design concepts, sketch plans, 3D models, and early cost estimates.
Refining the design, including structural, MEP, and architectural details to achieve consents, such as planning permission.
Preparing detailed technical drawings, specifications, and building regulations information.
Building the project, including off-site manufacturing and on-site construction.
Finalising construction, testing, commissioning, and handing over the building to the client.
Post-occupancy evaluation, ongoing maintenance, and monitoring of building performance.