Fawcett Villa Apartment

London – Listed Mansion Block
GAG 284

The project for Fawcett Villas involves the modernisation of an apartment within a listed London mansion block. The works involved window repair and upgrades, thermal enhancements to enable the client to use more sustainable forms of energy for heating and improvements to the acoustic resilience to mitigate the passage of sound, as the project was for a musician.

The design involved a full refurbishment to include the interior design and fit out of joinery works. Gagarin managed the contract under a strict time allocation for construction, as required for the local authority.

One of the design drivers for the project was a response to how the sun tracked around the apartment at different times of the day, enabling us  to create a series of distinct spaces for working, sleeping and socialising — each with it’s own character and mood, reflected in the design detail, materiality and atmosphere. A lovely micro-project, client and collaborators.

Services on this project

Architecture (0-7)
Gaining Consents
Sustainability & Passivhaus
Interior Design
Contract Administration
Principal Designer
Visualisation
RIBA Stages 0 – 6
Stage 0 –The Initial Consultation

Defining the project’s purpose, business case, and initial advice.

Stage 1 –Preparation and Briefing

Developing the project brief, assembling the project team, and conducting site surveys

Stage 2 –Concept Design

Creating initial design concepts, sketch plans, 3D models, and early cost estimates.

Stage 3 –Spatial Coordination

Refining the design, including structural, MEP, and architectural details to achieve consents, such as planning permission.

Stage 4 –Technical Design

Preparing detailed technical drawings, specifications, and building regulations information.

Stage 5 –Manufacturing and Construction

Building the project, including off-site manufacturing and on-site construction.

Stage 6 –Handover

Finalising construction, testing, commissioning, and handing over the building to the client.

Project process

Although we’ve been designing far longer, 2026 marks 15 years since Gagarin was officially launched. After hundreds of projects and various awards, in some ways it feels like we’re just getting started. That’s because we’ve now got the expertise and confidence to win and fulfil the work we want most.